Monday, September 19, 2011

+

Good morning Monday. Time for another renovation progress post. This past week the roof has been completely replaced, the plumbing fine tuned and plasterer hard at work. There is now plasterboard encasing the wooden surround of the stairs.
+

And new ceilings throughout the whole house.
(Which have already needed repair after a roofer feel through the ceiling in the lounge room...)
+

(See that big patch of plaster to the left? That would be where the roofer was hanging out, up to his armpits.)
+

The plasterer also turned his hands to finishing Dave's new wall for the bathroom,
+

and sheeting said bathroom. Which looks a whole lot different now to when we brought the house. So much bigger! Time to call in the tiler.
+

Recessed shaving cabinet before. The vanity will hang below the cabinet and next to it will be the shower.
+

Goodbye mirror tiles in the master bedroom, hello new ceiling.
+

And the old bar downstairs now has walls the whole way around and is shaping up to be a great little studio. Goodbye brick walls. Now to get rid of that lino and get painting.
+

Previous renovation posts: one, two, three, four and House Tour.
Related Posts Plugin for WordPress, Blogger...